Zoning Code | Application Forms

Forms All of the application forms related to land development are listed below. If you are looking for building permit forms, you are won't find them here, because they are posted here.

Application Fees The Town Board has established various review fees to cover the Town's administrative costs. A check, made payable to the Town of Eagle, should be included with your application.

Submittal Deadlines Some applications can be submitted at anytime. Others need to be submitted before a certain time, and determined to be complete, so they can be added to a meeting agenda. Because of that, you may want to submit your application before the deadline. That way, we can let you know if anything is missing and you'll have some time to perhaps get it done before the deadline.
 
Review Procedures Once an application is submitted, staff will review it to make sure it is complete. Once that determination has been made, it will be sent to the appropriate person or town body that has the authority to review it and render a decision. Depending on the type of application, there may be just a couple of steps in the process, or many. Check out the Procedures 
page, which describes each of the review procedures.

Pre-Application Meeting  Some of the review procedures require a pre-application meeting with staff to discuss what is being proposed, review submission requirements, and review the application and the review procedure.

Projects Requiring Multiple Reviews  Some projects will require a number of reviews. To the extent possible, we will try to schedule such reviews concurrently.


Digital Submittals Applications can be submitted in hard copy or as a digital file (in .PDF format).
 
Tips
  1. Depending on the nature of the application, you may need to include supplemental materials. Be sure to include them with your submittal.
  2. Please take the time to provide the information that is requested. If your application is missing needed information, it could potentially delay the review of your application.

Questions If you have any questions or need any assistance in filling out a form, feel free to contact Tim Schwecke, Town Planner, at 920-728-2814 or by email.
 
  

Preliminary Site Evaluation (PSE)

For most projects with an existing septic system Waukesha County Department of Parks and Land Use (Environmental Health Division) reviews proposed projects to determine (1) the operating condition of the existing septic system, (2) the approximate location of the system, and (3) whether the proposed project could have a detrimental effect on the continued operation of the system. A PSE is no required for a shed without a permanent foundation and interior remodels not involving bedrooms.

Prior Review of Land Transfers

Under state law, two adjoining property owners can transfer land from one to the other. This one-page form must be submitted for review to ensure both of the properties will comply with zoning requirements, such as minimum lot size, building setbacks, and other similar requirements.

Rural Accessory Building Determination

Wireless Facilities

Use this application for a commercial wireless facility, including Class I collocation, Class II collocation, and a new tower.

Zoning Permit

A zoning permit is required for most projects and is the last step before a building permit can be submitted. It is intended to verify the proposed work conforms to the Town's zoning regulations.

Zoning Permit - Checklist

Be sure to review this checklist when submitting a zoning permit. It identifies things that need to be submitted with your zoning permit application. Samples of a plat of survey and groundwater report are included so you know what they look like. A PSE form is also attached for your convenience.